Shenzhen HSJ Metal Fabrication Co., Ltd.
Shenzhen HSJ Metal Fabrication Co., Ltd.

Manufacturing & Delivery Cap

Manufacturing Capabilities at a Glance

Maximum Laser Cutting Size
Maximum Laser Cutting Size

4,000 × 2,000 mm

Maximum Bending Length
Maximum Bending Length

2,000 mm

Typical Dimensional Toleranc
Typical Dimensional Toleranc

±0.1 mm, subject to drawing review

Sample Lead Time
Sample Lead Time

Typically 2 weeks; as fast as 10 days

Bulk Production Lead Time
Bulk Production Lead Time

Typically 3–4 weeks

Fabrication Processes & Equipment

ItemTypeMachineQuantitySpecification单位Function
1LaserLaser machine13000WsetLaser cutting
2BendingHAIGEI bending machine1EG6520setUsed for bending and shaping
3HAIGEI CNC Bending Machine13613set
4HAIGEI CNC Bending Machine13613set
5Stampingstamping machine2JH21-110setStamping
6stamping machine1JH21-80set
7stamping machine1JH21-63set
8WeldingLaser welding machine1
setWelding aluminum, steel, and stainless steel materials
9Rui ling welder1305set
10welding machine2350set
11DrillingDrilling machine3
setCountersinking, tapping, drilling and other processes
12grinding machine1
setUsed for mold making or drilling processes
13Milling machine1
setUsed for mold making or drilling processes
14Small grinder1
set
15vertical driller1N503setCountersinking, tapping, drilling and other processes
16RivetingTapping machine1SWO-12set
17LY riveting machine25TsetPress riveting, machining fasteners
18Pressure riveting machine3H617-2sets-M3M8-2setsset
19Rivet machine H6172
set
20GrindingGrinder machine3JH-C380setSurface repair or polishing
21BrushingBrush machine1M2910setSurface repair or brushing


Materials & Processing Thicknesses

MaterialGradeThicknessSurface Treatment
Cold-rolled steel
Cold-rolled steel

SPCC

SGCC

SECC

SPTE

0.5–3.0 mm

Powder coating

Spray painting

0.5–3.0 mm

Zinc plating

Chromium plating

Silk screen printing

Hot-rolled steel / Other low-carbon steel

SPHC

Q235

3.0–6.5 mm
0.5–12 mm
Stainless steel

SS30

4SS301

SS316

0.2–8 mm

2B Brushed

Polished

Passivated

Spring steel — Suitable for spring clips
SS301-H, 1/2H, 1/4H, 3/4HNone
Mn65Heat treatment
AluminumAL5052-H32AL6061AL70750.5–6.5 mm

Anodizing

Powder coating

Spray painting

Sandblasting

Brass0.2–6.0 mmTin plating
Copper0.2–6.0 mmGold plating raw materials


From Prototypes to Volume Production

Prototype Manufacturing

Produce 1–10 sample pieces for evaluation and approval before production. Typical sample lead time is 2 weeks, with delivery as fast as 10 days depending on project requirements.


Small-Batch Production

Support batches of 10–1,000 sets with production schedules arranged around your order requirements. Typical production lead time is 3–4 weeks.


High-Volume & Repeat Orders

Support long-term orders exceeding 10,000 sets with dedicated positioning fixtures and production jigs to improve consistency. Services can include fabrication, assembly, testing, warehousing, packaging and shipping.


HSJ Production Capacity

HSJ supports ongoing supply across several product categories. The figures below indicate reported production capacity; project-specific availability and delivery schedules are confirmed during order review.


Product CategoryMonthly CapacityAnnual Capacity
Sheet Metal Parts20,000 pcs240,000 pcs
CNC Machined Parts10,000 pcs120,000 pcs
Stamped Parts10,000 pcs120,000 pcs
Plastic Products10,000 pcs120,000 pcs



From Incoming Materials to Shipment

A typical sheet metal production route is shown below. Actual operations and inspection points are arranged according to your drawings, product structure and finishing requirements.

From Incoming Materials to Shipment
From Incoming Materials to Shipment
From Incoming Materials to Shipment
From Incoming Materials to Shipment
From Incoming Materials to Shipment
From Incoming Materials to Shipment
From Incoming Materials to Shipment
From Incoming Materials to Shipment
From Incoming Materials to Shipment
From Incoming Materials to Shipment
From Incoming Materials to Shipment
From Incoming Materials to Shipment

Inside Our Manufacturing Facility

Explore our working environment, from raw material storage and fabrication to finished goods, packaging and container loading. Watch our production video for a closer look at factory operations.

Lead Times & International Shipping

Production Lead Times
Samples typically take 2 weeks, with the fastest projects completed in 10 days. Bulk production typically takes 3–4 weeks. Final schedules are confirmed according to drawings, materials, finishing and order quantity.

Shipping Options
Shipping options include sea freight by full container load or less-than-container load, and international express via DHL, FedEx or UPS.

Main Export Markets
Our main export markets include the United States, Germany, the United Kingdom, France and Israel.

We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Visit our cookie policy to learn more.
Reject Accept